Rules &
Regulations
|
|
RULES
AND REGULATIONS |
PART 3 - Section 10 - 12 |
ESTABLISHING
STANDARDS FOR SUBDIVISION WATER SYSTEMS
within
the County of Kauai
and
Providing Penalties for the Violations Thereof
SECTION
X - MATERIALS AND CONSTRUCTION STANDARDS,
INSTALLATION
OF WATER SERVICE, INSPECTION OF WORK
1.
Materials and
Construction Standards.
All materials, design and construction procedures, and
workmanship, with respect to any subdivision water system, or any
portion thereof shall be in accordance with the requirements of the
“Standard Specifications for Waterworks Construction” of the Board
of Water Supply, County of Kauai, dated 10/1/63 or as later amended and
with the requirements of the State Department of Health and all
applicable laws. The
Manager and Chief Engineer shall determine the capacity and location of
any of the component parts of the subdivision water system.
2.
Installation
of Water Service. No water service will be approved until the subdivision water
system has been completed and accepted by the Department and the FRC has
been paid to the Department. Service
for subdivision construction purposes such as site work and roadways
(excluding construction work for individual lots) may be approved.
3.
Inspection of
Work.
The Manager and Chief Engineer or any employee representing him
shall have free access at all times to all installations made for the
subdivision and shall be given any assistance required and every
facility, information and means of thoroughly inspecting the work to be
done and the materials used or to be used.
SECTION
XI - OWNERSHIP OF INSTALLED WATER SYSTEM
Before the Department will provide water service within the
subdivision, the subdivider shall convey the subdivision water system to
the Department and said subdivision water system thereafter will be
maintained and operated as a part of the public water system; provided,
however, that the Department may refuse to operate and maintain
facilities installed without the Department’s prior approval.
Prior to the commencement of water service, and as a prerequisite
to such service, the subdivider shall also deliver to the Department
perpetual easements for all portions of the subdivision water system
installed in other than publicly owned property.
The subdivider shall also convey to the Department fee simple
title to all sites on which are located tanks, reservoirs, sources of
supply, and pumps constructed by the subdivider and connected to the
public water system together with easements for ingress and egress.
The subdivider shall also convey to the Department a breakdown of
costs of the subdivision water system on forms provided by the
Department.
SECTION
XII - MODIFICATION OF REQUIREMENTS
When conditions pertaining to any subdivision are such that
the public may be properly served with water and with fire protection
without full and strict compliance with these rules and regulations, or
where the subdivision site or layout is such that the public interest
will be adequately protected, such modification thereof as is reasonably
necessary or expedient, and not contrary to law or the intent and
purposes of these rules and regulations, may be made by the Department.
General | Water
Board | Conservation |
Service
Water Quality | Water
Plan 2020 | Credits | Disclaimer
| Site Map